Analysis confirms that installing a BOS Emulsified Fuel System at the same time as a Selective Catalytic Reduction system delivers substantial cost savings

As BOS EFS can reduce NOx emission down to 20% at source (i.e during combustion), the size of SCR can be smaller. At the same time, SCR needs to produce less urea bringing down the operational cost as well.

For example,
CAPEX per SCR = USD3,000,000.00
CAPEX of SCR can be reduced by 20% i.e. USD600,000.00 savings

If the OPEX of the SCR is USD1,000,000.00
OPEX of SCR can be reduced by 20% i.e. USD200,000.00 savings